Alpha & Omega Storage

Working as a Design/Build GC for the project Mishler build this 13,600sf Pre-engineered building for our client as an investment property for his oil/gas tenant.  The Mishler team was instrumental in the design of the project providing critical input such as cost saving options, constructability review, system/material analysis, budget control and cost estimating.  The PEMB structure included a large 2nd story mezzanine area and 50’ clear spans.  The design utilized translucent light panels and a mechanically seamed roof panel.  The floorplan of the building includes warehouse/shop space, administrative areas and employee break area.  Two 15 ton overhead cranes where also part of the warehouse area.  Site work involved a very compact sight with multiple existing buildings and structures.

Burrito Kitchens

This 23,000+ SF food production facility was constructed utilizing  conventional/PEMB structural steel with architectural insulated panels. The project features state of the art food production systems as well as frozen and fresh food cold storage racking. Building features also include a large shipping/receiving dock area, office administration areas, employee breakroom and storage facilities. Participating in a Design/Assist role Mishler was fully engaged in the design, budgeting and delivery process.  Our Design/Assist team added valuable input for cost savings, systems review and constructability planning. 

Intellivation Industries

Constructed in Loveland, CO this original new build along with numerous additions include warehouse, manufacturing and office areas and serves as the corporate headquarters for the client. Mishler constructed the original building in 2020 and has provided two additions since. Engaged as the Design/Assist GC for the project, Mishler Construction was instrumental in the design of the project providing critical input such as cost saving options, constructability review, system/material analysis, budget control and cost estimating. Structure is a PEMB(pre-engineered building) with large clear spans and utilizes multiple PEMB products including windows, wall panels and mechanically seamed roof panels. Site work includesd revision of existing storm water system, parking lot,  revision of site access and storage areas.

General Air

This new Greeley, CO warehouse, sales and showroom for General Air was accomplished utilizing our Design/Assist services. Mishler provided critical input for design, value engineering, product evaluation and system analysis. Building structure was a PEMB with Insulated Metal Panels, stone wainscot, and standing seam metal roof panels. Features include a large covered dock area, large ventilated welding school space, product showroom, and full height product storage warehouse. Site work included a new parking, loading and laydown areas, a new storm water pond and site lighting.

Solomon Phase III

The Solomon Foundation Phase 3 located in the Town of Parker, CO, is our 2nd Design/Assist project for Solomon.  This Site Plan Amendment added a 3rd structure to their existing site increasing their total building footprint to over 60,000 square feet. Construction took  place within the property and consisted of a new 28,686 square foot building with parking improvements and landscaping. Utilities included storm network modifications, water and sanitary services for the new building. The new building use is a combination of administration and other ancillary uses.  The building also includes a large covered parking structure.

Solomon/Secor – Phase II

It was our great privilege to partner with the Solomon Foundation to construct a home for the SECOR CARES organization.  With this new facility SECOR CARES continues to grow and expand not only the number of guests served, but also the myriad offerings to their guests.  From Food for Thought for school aged children to life coaching through their Community of Hope, to resources for senior guests, SECOR Cares continues to create new opportunities through the support of sponsors, partners, volunteers and donors. A new Design/Assist project with over 23,000sf this 2-story building features commercial food storage facilities,  loading/unloading dock facility, large commercial walk in coolers/freezers and a public free food market.  Additionally there are facilities for administration, counseling, group gatherings and other ancillary SECOR services. Building structure is a 2-story concrete tilt-up structure.

Bank of Colorado

Completed September of 2016, this is the second branch for the Bank of Colorado in Greeley, CO. Working with R4 Architects and JL Development, Mishler was engaged as the general contractor early in the design process and was part of the pre-construction team providing project design input including value engineering, constructibility review and product review. Project features include drive up banking facilities, vault, administrative and banking functions. The building also features a large tenant lease space for future tenant finish and possible expansion.

Boyer’s Coffee

Mishler provided full Tenant Improvement services for this retail coffee shop project in South Denver. The project included stained concrete floors, full kitchen design and install, serving areas, customer services areas and customer seating.

Salud Longmont

Mishler was engaged by Salud in August of 2013 to complete a major addition and renovation of it’s existing clinic in Longmont, CO. The existing clinic was constructed by Mishler Construction in 2004. The project features a 10,000 sf medical wing addition and a 2,500 sf dental wing addition. Additionally, once the additions are finished we will complete a renovation of the existing clinic. All work will be completed while Salud continues normal business operations. Through careful planning and coordination Salud operations will not be interrupted. The project features the addition of medical and dental exam rooms, medical procedure rooms, clean/dirty rooms and lab services and a pharmacy.

Boulder Scientific Admin

This Design/Build project for a large local chemical manufacturing company serves as the clients administrative headquarters. At just over 17,000sf this pre-engineered structure featured insulated texture panels, a 0.5/12 pitch standing seam roof, full parapets and many architectural features. Working thru budget and design Mishler was able to bring added value to the project giving vital input on the building systems and cost saving suggestions. Mishler also provided site plan approval services and worked closely with the owner and Town of Mead planning on bringing this project to reality.