Woodlands Event Barn

This 6,000 square foot event barn is located in the beautiful foothills of Morrison, CO. A Design/Build project utilizing a post/beam wood barn structure the project features a large assembly area for guests. The building design also includes bride/groom rooms, catering facilities and bar area. The facility will be used for weddings, receptions, parties and other large group gatherings.

Boulder Scientific

This Design/Build project for a large local chemical manufacturing company serves as the clients administrative headquarters. At just over 17,000sf this pre-engineered structure featured insulated texture panels, a 0.5/12 pitch standing seam roof, full parapets and many architectural features. Working thru budget and design Mishler was able to bring added value to the project giving vital input on the building systems and cost saving suggestions. Mishler also provided site plan approval services and worked closely with the owner and Town of Mead planning on bringing this project to reality.

Peak Kia

Working with Casseday Creative Design, Mishler was engaged to provide Pre-construction and General Contracting Services for the construction of a Service and Hospitality facility for Peak KIA North located in Windsor, CO. This 23,000 square foot facility included areas for service and customer hospitality. Features include an express oil and filter change lane and a 6,500-square-foot automotive service area with enough room for 11 vehicles at a time. Other areas include a conference and break room, offices, public restrooms and a customer hospitality center for customers to wait while their car is serviced. The hospitality center includes a fenced, outdoor playground that can only be accessed from inside the building, an upscale coffee bar, Internet bar and a fireplace for the ambiance. The lot includes 176 parking spaces, with about 25 dedicated for customers.

Bank of Colorado

Completed September of 2016, this is the second branch for the Bank of Colorado in Greeley, CO. Working with R4 Architects and JL Development, Mishler was engaged as the general contractor early in the design process and was part of the pre-construction team providing project design input including value engineering, constructibility review and product review. Project features include drive up banking facilities, vault, administrative and banking functions. The building also features a large tenant lease space for future tenant finish and possible expansion.

Salud Dental and Medical

The Salud Commerce City Dental and Medical facility is our sixth new construction project for Salud Family Health Centers and was completed in December of 2009. As a critical participant in the design process we provided vital input such as cost saving options, constructability, product review, budget and cost estimating. The project featured multiple medical and dental exam rooms, medical procedure rooms, clean/dirty rooms, lab service areas and a pharmacy. The Dental clinic featured panoramic x-ray and a complete dental gas system.