Alpha & Omega Storage

Working as a Design/Build GC for the project Mishler build this 13,600sf Pre-engineered building for our client as an investment property for his oil/gas tenant.  The Mishler team was instrumental in the design of the project providing critical input such as cost saving options, constructability review, system/material analysis, budget control and cost estimating.  The PEMB structure included a large 2nd story mezzanine area and 50’ clear spans.  The design utilized translucent light panels and a mechanically seamed roof panel.  The floorplan of the building includes warehouse/shop space, administrative areas and employee break area.  Two 15 ton overhead cranes where also part of the warehouse area.  Site work involved a very compact sight with multiple existing buildings and structures.

Burrito Kitchens

This 23,000+ SF food production facility was constructed utilizing  conventional/PEMB structural steel with architectural insulated panels. The project features state of the art food production systems as well as frozen and fresh food cold storage racking. Building features also include a large shipping/receiving dock area, office administration areas, employee breakroom and storage facilities. Participating in a Design/Assist role Mishler was fully engaged in the design, budgeting and delivery process.  Our Design/Assist team added valuable input for cost savings, systems review and constructability planning. 

Intellivation Industries

Constructed in Loveland, CO this original new build along with numerous additions include warehouse, manufacturing and office areas and serves as the corporate headquarters for the client. Mishler constructed the original building in 2020 and has provided two additions since. Engaged as the Design/Assist GC for the project, Mishler Construction was instrumental in the design of the project providing critical input such as cost saving options, constructability review, system/material analysis, budget control and cost estimating. Structure is a PEMB(pre-engineered building) with large clear spans and utilizes multiple PEMB products including windows, wall panels and mechanically seamed roof panels. Site work includesd revision of existing storm water system, parking lot,  revision of site access and storage areas.

General Air

This new Greeley, CO warehouse, sales and showroom for General Air was accomplished utilizing our Design/Assist services. Mishler provided critical input for design, value engineering, product evaluation and system analysis. Building structure was a PEMB with Insulated Metal Panels, stone wainscot, and standing seam metal roof panels. Features include a large covered dock area, large ventilated welding school space, product showroom, and full height product storage warehouse. Site work included a new parking, loading and laydown areas, a new storm water pond and site lighting.