Commercial Projects
-
Alpha & Omega Storage
Working as a Design/Build GC for the project Mishler build this 13,600sf Pre-engineered building for our client as an investment property for his oil/gas tenant. The Mishler team was instrumental in the design of the project providing critical input such as cost saving options, constructability review, system/material analysis, budget control and cost estimating. The PEMB
-
Burrito Kitchens
This 23,000+ SF food production facility was constructed utilizing conventional/PEMB structural steel with architectural insulated panels. The project features state of the art food production systems as well as frozen and fresh food cold storage racking. Building features also include a large shipping/receiving dock area, office administration areas, employee breakroom and storage facilities. Participating in
-
Intellivation Industries
Constructed in Loveland, CO this original new build along with numerous additions include warehouse, manufacturing and office areas and serves as the corporate headquarters for the client. Mishler constructed the original building in 2020 and has provided two additions since. Engaged as the Design/Assist GC for the project, Mishler Construction was instrumental in the design
-
General Air
This new Greeley, CO warehouse, sales and showroom for General Air was accomplished utilizing our Design/Assist services. Mishler provided critical input for design, value engineering, product evaluation and system analysis. Building structure was a PEMB with Insulated Metal Panels, stone wainscot, and standing seam metal roof panels. Features include a large covered dock area, large
-
Solomon Phase III
The Solomon Foundation Phase 3 located in the Town of Parker, CO, is our 2nd Design/Assist project for Solomon. This Site Plan Amendment added a 3rd structure to their existing site increasing their total building footprint to over 60,000 square feet. Construction took place within the property and consisted of a new 28,686 square foot
-
Solomon/Secor – Phase II
It was our great privilege to partner with the Solomon Foundation to construct a home for the SECOR CARES organization. With this new facility SECOR CARES continues to grow and expand not only the number of guests served, but also the myriad offerings to their guests. From Food for Thought for school aged children to life coaching
-
Bank of Colorado
Completed September of 2016, this is the second branch for the Bank of Colorado in Greeley, CO. Working with R4 Architects and JL Development, Mishler was engaged as the general contractor early in the design process and was part of the pre-construction team providing project design input including value engineering, constructibility review and product review.
-
Boyer’s Coffee
Mishler provided full Tenant Improvement services for this retail coffee shop project in South Denver. The project included stained concrete floors, full kitchen design and install, serving areas, customer services areas and customer seating.
-
Salud Longmont
Mishler was engaged by Salud in August of 2013 to complete a major addition and renovation of it’s existing clinic in Longmont, CO. The existing clinic was constructed by Mishler Construction in 2004. The project features a 10,000 sf medical wing addition and a 2,500 sf dental wing addition. Additionally, once the additions are finished
-
Boulder Scientific Admin
This Design/Build project for a large local chemical manufacturing company serves as the clients administrative headquarters. At just over 17,000sf this pre-engineered structure featured insulated texture panels, a 0.5/12 pitch standing seam roof, full parapets and many architectural features. Working thru budget and design Mishler was able to bring added value to the project giving










