Commercial Projects

  • Bank of Colorado

    Bank of Colorado

    Completed September of 2016, this is the second branch for the Bank of Colorado in Greeley, CO. Working with R4 Architects and JL Development, Mishler was engaged as the general contractor early in the design process and was part of the pre-construction team providing project design input including value engineering, constructibility review and product review.

    View Full Project »

  • Boyer’s Coffee

    Boyer’s Coffee

    Mishler provided full Tenant Improvement services for this retail coffee shop project in South Denver. The project included stained concrete floors, full kitchen design and install, serving areas, customer services areas and customer seating.

    View Full Project »

  • Salud Longmont

    Salud Longmont

    Mishler was engaged by Salud in August of 2013 to complete a major addition and renovation of it’s existing clinic in Longmont, CO. The existing clinic was constructed by Mishler Construction in 2004. The project features a 10,000 sf medical wing addition and a 2,500 sf dental wing addition. Additionally, once the additions are finished

    View Full Project »

  • Boulder Scientific Admin

    Boulder Scientific Admin

    This Design/Build project for a large local chemical manufacturing company serves as the clients administrative headquarters. At just over 17,000sf this pre-engineered structure featured insulated texture panels, a 0.5/12 pitch standing seam roof, full parapets and many architectural features. Working thru budget and design Mishler was able to bring added value to the project giving

    View Full Project »

  • Peak Kia

    Peak Kia

    Working with Casseday Creative Design, Mishler was engaged to provide Pre-construction and General Contracting Services for the construction of a Service and Hospitality facility for Peak KIA North located in Windsor, CO. This 23,000 square foot facility included areas for service and customer hospitality. Features include an express oil and filter change lane and a

    View Full Project »

  • JBS Corporate

    JBS Corporate

    JBS International engaged Mishler Construction to complete a large addition and tenant finish to their North American Headquarters in Greeley, CO. The project included a large office cubicle area as well as breakroom and administration functions. The project features a 2 story fill in addition as well as finishes to existing areas within the structure.

    View Full Project »

  • Lake City

    Lake City

    We were first contacted by the Lake Fork Health District in 2007 about the possibility of designing and constructing a new Medical and Dental Facility. At that time we began the process of programming and studying the feasibility of a new clinic to replace the existing clinic.. The existing clinic was rapidly approaching it’s maximum

    View Full Project »

  • Woodlands Event Barn

    Woodlands Event Barn

    This 6,000 square foot event barn is located in the beautiful foothills of Morrison, CO. A Design/Build project utilizing a post/beam wood barn structure the project features a large assembly area for guests. The building design also includes bride/groom rooms, catering facilities and bar area. The facility will be used for weddings, receptions, parties and

    View Full Project »

  • Salud Dental and Medical

    Salud Dental and Medical

    The Salud Commerce City Dental and Medical facility is our sixth new construction project for Salud Family Health Centers and was completed in December of 2009. As a critical participant in the design process we provided vital input such as cost saving options, constructability, product review, budget and cost estimating. The project featured multiple medical

    View Full Project »